Skip to main content
GovSpend

The Boeing Company

Federal Contractor · Rank #4

Total Federal Spending
$8.6B
$8,599,888,294
Total Obligations
25
Total Awards
25
Contracts
2
Agencies

Spending by Agency

Recent Awards

DescriptionAgencyStart DateAmount
KC-X MODERNIZATION PROGRAMDepartment of DefenseFeb 24, 2011$32.0B
INTERNATIONAL SPACE STATIONNational Aeronautics and Space AdministrationNov 15, 1993$22.4B
200112!000108!9700!ZD60 !BALLISTIC MISSILE DEFENSE ORG. !HQ000601C0001 !A!N!*!N! !20001222!20080930!848025649!848025649!009256819!N!THE BOEING COMPANY !3370 E MIRALOMA AVE !ANAHEIM !CA!92806!37000!089!01!HUNTSVILLE !MADISON !ALABAMA !+000383571022!N!N!000000000000!AD93!RDTE/OTHER DEFENSE-ADV TECH DEV !S1 !SERVICES !1CAA!BALLISTIC MISSILE DEFENSE SYS !541710!*!*!3! ! ! !*!*!*!B!*!*!A! !A !U!R!2!001!B! !Z!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001!Department of DefenseDec 22, 2000$18.8B
USN P-8A FRP II LONG LEAD MATERIALDepartment of DefenseAug 14, 2014$18.1B
RSAF F-15 FLEET MODERNIZATION PROGRAMDepartment of DefenseMar 8, 2012$11.2B
Federal contractDepartment of DefenseOct 2, 2003$11.1B
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.National Aeronautics and Space AdministrationSep 1, 2007$10.5B
Federal contractDepartment of DefenseJun 29, 2004$7.6B
W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS.Department of DefenseMar 21, 2016$7.4B
F-15, FMS, F-15QA AIR VEHICLE DEVELOPMENTDepartment of DefenseDec 22, 2017$7.0B
THE MISSILE DEFENSE AGENCY (MDA), GROUND-BASED MIDCOURSE DEFENSE (GMD) DEVELOPMENT AND SUSTAINMENT CONTRACT (DSC) THE GMD DSC WORK INCLUDES, BUT IS NOT LIMITED TO: 1) FUTURE DEVELOPMENT; 2) FIELDING; 3) TEST; 4) SYSTEMS ENGINEERING, INTEGRATION AND CONFIGURATION MANAGEMENT; 5) EQUIPMENT MANUFACTURING AND REFURBISHMENT; 6) TRAINING; AND 7) OPERATIONS AND SUSTAINMENT SUPPORT FOR THE GMD WEAPON SYSTEM AND ASSOCIATED SUPPORT FACILITIES.Department of DefenseDec 30, 2011$6.5B
P-8A LRIP I LONG LEAD MATERIALDepartment of DefenseApr 13, 2009$5.7B
P-8A FRP LOT I LONG LEAD MATERIALDepartment of DefenseAug 31, 2012$5.5B
F/A-18E AIRCRAFTDepartment of DefenseMay 8, 2018$5.5B
CH-47F CARGO HELICOPTER MULTIYEAR II. 34 NEW BUILD HELICOPTERS AND 121 RENEW HELICOPTERS.Department of DefenseJun 10, 2013$4.9B
GBI/AUR PROGRAM MANAGEMENT/SYSTEMS ENGDepartment of DefenseMar 18, 2019$4.4B
CH-47F MULTI-YEAR CONTRACT FOR NEW BUILD AND REMANUFACTURE AIRCRAFTSDepartment of DefenseAug 26, 2008$4.4B
F-15EX LOT 5 ADVANCED PROCUREMENTDepartment of DefenseSep 27, 2023$3.9B
ACAT I, AFLCMC/WLJK, PRESIDENTIAL AIRCRAFT RECAPITALIZATIONDepartment of DefenseJan 4, 2016$3.8B
APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION.Department of DefenseJun 18, 2021$3.5B